Event Timeline
| Date | Time | Activity | Details |
|---|---|---|---|
| August 5 | Night | Travel to Bangkok | Team flight from Chiang Mai to Bangkok. Stay at Marsi Hotel, Sukhumvit 101/1. |
| August 6 | 07:00 | Equipment transfer | Move all equipment and materials to the 5th floor. Each move takes approximately 15–20 minutes. |
| August 6 | 07:30–17:00 | NaoDec setup | Unpack; set up the structure and electronics; decorate; test; manage the wiring; and clean up the area. Lunch break approximately 1 hour. |
| August 6 | 17:00–18:30 | Support / standby | Remain on-site in case additional support is required. |
| August 7 | 10:30–20:30 | Event operation | Event starts at 10:30 and ends at 20:30. Event operation and support. |
| August 7 | Morning | Local IT sourcing | Pom and Bird sourced a 5 m HDMI cable and an HDMI-to-mini-HDMI adapter from a local IT store. |
| August 7 | Afternoon | RTX 3090 retrieval | Pom went to Nonthaburi to retrieve the RTX 3090. |
| August 7 | Afternoon | Spare amplifier shipment | Bird and Benz handled the shipment from Chiang Mai for the spare amplifier. |
| August 7 | 12:00 | Ice returns to Chiang Mai | Ice headed back to Chiang Mai. |
| August 8 | 10:30–20:30 | Event operation | Event operation and support. |
| August 9 | 10:30–20:30 | Event operation | Event operation and support. |
| August 9 | Afternoon | Additional errands | Pom sourced the greeting cards and picked up the trolley. |
| August 10 | 10:00–17:00 | NaoDec tear down | Remove all decorations and electronics; tear down the structure; and pack all items. Lunch break approximately 1 hour. |
| August 10 | Approximately 14:30 | Structure tear down completed | Tear down of the main structure was completed. |
| August 10 | 17:00 | Initial move-out | Some items were moved out. |
| August 10 | 17:00–18:30 | Remaining equipment transfer | The remaining items were moved to the area next door; completed at approximately 18:30. |
| August 10 | 20:00 | Cloud 11 move-out preparation | Prepare to move out from Cloud 11. |
| August 10 | Until 23:00 | Final transportation | Transport equipment to Silom Grand Terrace and Highcraft, then return to the hotel at approximately 23:00. |
| August 11 | Afternoon | Travel back to Chiang Mai | Team flight back to Chiang Mai. |
Detailed Work Breakdown
August 6 — NaoDec Setup
- Move all equipment and materials to the 5th floor at 07:00.
- Unpack the equipment and materials.
- Set up the structure and electronics.
- Complete the decoration.
- Test the setup.
- Manage the wiring.
- Clean up the area.
- Remain on-site for support until 18:30.
August 7–9 — Event Operation and Additional Tasks
- The event operated from 10:30 to 20:30 each day.
- Pom and Bird: Sourced a 5 m HDMI cable and HDMI-to-mini-HDMI adapter on August 7.
- Pom: Retrieved the RTX 3090 from Nonthaburi on August 7.
- Bird and Benz: Handled shipment of the spare amplifier from Chiang Mai.
- Ice: Returned to Chiang Mai at 12:00 on August 7.
- Pom: Sourced greeting cards and picked up the trolley on August 9.
August 10 — NaoDec Tear Down
- Remove decorations and electronics.
- Tear down the structure, completed at approximately 14:30.
- Pack all equipment and materials.
- Move items out at 17:00 and the remaining items by approximately 18:30.
- Prepare to move out from Cloud 11 at 20:00.
- Transport equipment to Silom Grand Terrace and Highcraft, then return to the hotel at approximately 23:00.
Key Operational Notes
- The team’s responsibilities included travel, equipment transfers, setup, decoration, testing, wiring, cleanup, event operation, standby support, sourcing, shipment coordination, tear down, packing, and final transportation.
- Setup and tear-down responsibilities extended beyond the primary scheduled work periods because of on-site standby, equipment movement, and late-night transportation.